Core: every site of this kind has it. Common: most sites have it. Optional: depends on the site.

Heating & cooling plant

GMP temperature and humidity depend on steady chilled water and steam.

EquipmentLevelPoints worth watchingNotes
ChillerCoreCHW supply temp · CHW return temp · Load · Power draw · Efficiency · FaultMid-size plant chillers on BACnet/IP.
Cooling tower cellCoreTower leaving water · Tower entering water · Fan speed · Basin level · Water conductivity · Fan vibration
PumpCoreRunning · Speed · Differential pressureChilled and condenser water pumps; drives usually on Modbus TCP.
Steam boilerCommonSteam pressure · Firing rate · Drum water level · Low-water cutoff · Fault
Hot-water boilerCommonHot water supply temp · Hot water return temp · Firing rate · Flue gas temp · Fault
Heat-recovery chiller / heat pumpOptionalHot water supply temp · Chilled water supply temp (recovery side) · Power draw · Combined COPHeat recovery displacing boiler gas — one of the main decarbonization levers.
Absorption chillerOptionalCHW supply temp · Crystallization alarm

GMP HVAC & cleanrooms

Grade A/B/C/D cascades, particles and T/RH are recorded by the EMS.

EquipmentLevelPoints worth watchingNotes
Make-up air unitCommonSupply air temp · Supply dew point · Outdoor airflow
Recirculation air unitCoreSupply air temp · Recirculation airflow · Filter pressure dropGMP AHUs, duty/standby or N+1.
GMP environmental monitoring systemCoreOpen cleanroom excursions · Open cold-chain excursions · Sensors offlineA validated, independent EMS (e.g. Vaisala viewLinc, Rees) is the system of record.
Vivarium roomCoreRoom temp · Relative humidity · Pressure vs corridor · Air changes per hour · Light level · Photoperiod: lights on
HumidifierCommonControlled humidity · Cylinder / nozzle service
Pass-through / airlock interlockCommonBoth doors open · UV lamp hours

Clean utilities: PW, WFI, clean steam

Conductivity and TOC are release limits; cool WFI loses self-sanitization.

EquipmentLevelPoints worth watchingNotes
Reverse osmosis unitCorePermeate conductivity · Permeate flow
Electrodeionization unitCoreProduct resistivity
Purified water loopCoreConductivity (25°C comp.) · TOC · Loop temp · Loop ozone · Ozone-destruct UV onUSP <645> conductivity and USP <643> TOC (500 ppb typical limit).
pH neutralization systemCommonEffluent pH · FlowIncluding bio-kill.
Domestic water boosterCommonDischarge pressure · Flow
Steam trap monitoringOptionalTraps failed · Estimated steam loss
Condensate return unitOptionalConductivity

Process equipment (monitor only)

The batch system runs the process; the platform confirms utilities keep up.

EquipmentLevelPoints worth watchingNotes
AutoclaveCoreChamber temp · Chamber pressure · Cycle phase (0 idle … 5 dry) · Cycle aborted
Freeze dryer (lyophilizer)CommonChamber pressure · Batch alarm
Isolator / RABSCommonPressure to room · Glove leak test failed
Vial washerOptionalWFI temp · WFI pressure
Depyrogenation tunnelOptionalHot-zone temp
Aseptic filling lineCommonFill rate · Reject rate
Chromatography skidCommonUV absorbance · Over-pressure
Ultrafiltration / TFF skidCommonTransmembrane pressure
Solution preparation systemCommonTank level · Batch alarm

Cold chain

2–8°C, −20°C, −80°C and LN2 vapor storage; excursions need QA review.

EquipmentLevelPoints worth watchingNotes
Cold room (2–8°C)CoreRoom temp · Door left open · Refrigeration power failure
Freezer (−20°C)CoreCabinet temp · Door open · Power failure
Ultra-low freezer (−80°C)CoreCabinet temp · Power failure · LN2/CO2 backup cooling on−80°C (−112°F), often with LN2/CO2 backup.
Temperature mapping setCommonColdest logger · Warmest logger · Mean kinetic temperature (MKT) · Loggers reportingWarehouse and cold-room temperature mapping.
Stability chamberCommonChamber temp · Excursion

Compressed air & process gases

Product-contact air must be oil-free and dry; CO2, O2 and N2 feed bioreactors and inerting.

EquipmentLevelPoints worth watchingNotes
Air compressorCoreDischarge pressure · Load · Power draw · Fault
Desiccant air dryerCorePressure dew point · Pressure drop · Regeneration temp · FaultDew point usually specified as an ISO 8573-1 class, e.g. −40°F.
Compressed-air headerCommonHeader pressure · Air demand · Receiver pressure
Bulk gas supplyCoreTank level · Supply pressure · Vaporizer outlet temp · Flow · Impurity · Reserve supply in useN2, O2, Ar, H2, CO2; tank telemetry is usually the gas supplier's.
Oxygen deficiency monitorCoreOxygen · Alarm 1 (O2 below 19.5 %) · Alarm 2 (O2 below 18 %)LN2 storage and CO2 areas.
Cryogenic vaporizerCommonOutlet gas temp · Low outlet temp

Exhaust

Lab and process exhaust; solvent oxidizers.

EquipmentLevelPoints worth watchingNotes
Process exhaust systemCoreExhaust main static · Exhaust airflow · Fans running · Low exhaust staticWatch general, heat, solvent and acid exhaust separately; N+1 fans.
Exhaust fanCommonRunning · Speed

Power & sub-metering

The EMS, cold chain and Grade B HVAC must be on emergency power.

EquipmentLevelPoints worth watchingNotes
Medium-voltage switchgearCoreBus voltage · Incoming current · Real power · Breaker closed · Protective trip · Relay troubleMonitor only — never operate breakers.
Low-voltage switchgearCoreBus voltage · Load current · Real power · Power factor · Current THD · Breaker trip
Power transformerCommonTop-oil temp · Winding temp · Load · Gas / sudden-pressure alarm · Over-temperature alarm
TransformerCommonWinding temp · Load · Over-temperature alarmDry-type transformers.
UPSCoreLoad · Battery runtime · On bypassSNMP v3 (UPS-MIB).
UPS battery string monitorCoreString voltage · Lowest jar voltage · Highest jar voltage · Highest jar internal resistance · Highest jar temp · State of chargePer-jar resistance trending (one of the maintenance practices in IEEE 1188).
GeneratorCoreRunning · Output power · Fuel tank level · Starting battery voltage · Not in AUTO
Branch transfer switchCommonOn emergency source · Normal source available · Emergency source available
Power quality meterCommonVoltage THD · Current THD · Voltage sags today · Sag / interruption eventVoltage sags are a common hidden cause of trips.
Site utility meterCoreSite power · Site power (MW) · Energy today · Power factor
Area energy meterCoreArea power · Energy today · 15-min demand · Power factorSub-metering by workshop or system for energy analysis and cost allocation.
Natural gas meterCommonNatural gas flow · Heat input (1,037 BTU/scf) · Gas today (scf)Natural gas in scfh, converted to BTU/h by heating value.

Life safety Monitor only

Fire, leaks and solvent vapour. Monitor only.

EquipmentLevelPoints worth watchingNotes
Fire alarm zone & linkageCoreFire alarm · Supervisory · Trouble · Linkage: air handlers stopped · Linkage: fire/smoke dampers closed · Linkage: smoke exhaust running · Linkage: elevators recalledLinkage proofs verify the fire system did what it should.
Fire alarm panelCoreFire alarm · Supervisory signal · Trouble signalMonitor only (NFPA 72).
Aspirating smoke detectorCommonSmoke obscuration (%/ft) · Alert · Action · Fire 1 · Airflow fault
Leak detection cableCoreLeak detected · Distance to leak · Leak zone · Cable break or contamination
Sprinkler riserCommonRiser pressure · Waterflow alarm · Valve tamper
Pre-action / dry-pipe valveCommonAir pressure · Valve tripped · Low air

Security & video Monitor only

Camera and door status, and video linkage: cameras are linked to areas, devices and alarm rules; on an alarm the gateway takes an ONVIF snapshot and attaches it to the alarm, with a live-view link to the NVR/VMS. Core never contacts a camera.

EquipmentLevelPoints worth watchingNotes
Video cameraCommonOnline · Recording · Motion detected · Video analytics alarm · Tamper (blocked or moved)Status via the VMS (Milestone, Genetec…); on an alarm the gateway takes an ONVIF snapshot and attaches it to the alarm — Core never contacts a camera.
Access-controlled doorCoreDoor open · Door held open · Door forcedGMP suites and cell-bank access.

Life-safety equipment (fire alarm, gas detection, emergency power transfer) and protection devices are monitored only. FacilityOS never sends them commands.

Standards and compliance

Standards and complianceNotes
EU GMP Annex 1 (2022)Manufacture of sterile medicinal products: Grade A–D cleanrooms, environmental monitoring and contamination control strategy. Grade A ≥ 0.5 µm limit 3,520/m³.
21 CFR Part 11Electronic records and electronic signatures.
21 CFR 210/211Current good manufacturing practice for finished pharmaceuticals.
FDA Aseptic Processing Guidance (2004)Guidance for sterile drug products produced by aseptic processing.
ISO 14644-1 / -2Cleanroom classification and ongoing monitoring.
USP <645> / <643> / <1231>Water conductivity, total organic carbon and water for pharmaceutical purposes.
ISPE Baseline Guide Vol. 4Water and steam systems.
GAMP 5A risk-based approach to compliant GxP computerized systems.
WHO TRS 961 Annex 9Model guidance for storage and transport of time- and temperature-sensitive pharmaceutical products.
NSF/ANSI 49Biosafety cabinetry design, performance and field certification.
ISO 13485Medical devices quality management systems.
NFPA 72National Fire Alarm and Signaling Code.

Standards are listed with what they cover; numeric values are typical figures, not requirements for every site. FacilityOS supports your compliance work; it does not certify a site.

Segments of Biopharma & life sciences

Full Biopharma & life sciences solution →

How we deliver

We can take a Biopharma & life sciences project from survey and design through procurement, installation, commissioning and training — all of it, or only the stages you need.

  1. Site survey & needs assessment
  2. Solution design
  3. Procurement
  4. Installation