Copper tube & metal processing

Copper tube (ACR and plumbing) and copper rod and wire: melting and casting, rolling, drawing, annealing and in-line testing; heavy motor loads, cooling water and protective gas.

How FacilityOS helps

Platform modules used

Segments

Systems and equipment

Core: every site of this kind has it. Common: most sites have it. Optional: depends on the site.

Melting, casting, rolling, drawing, annealing

If melting or casting stops, the copper freezes and the line is down for clean-up.

EquipmentLevelPoints worth watchingNotes
Copper shaft furnaceCoreMelt temp · Gas flow · Melt rate · Melt oxygen · Holding furnace temp
Horizontal continuous casterCoreCasting speed · Mold water outlet temp · Mold cooling water · BreakoutMold cooling water is the caster's lifeline: low-flow alarm and a standby pump.
Planetary rolling millCopper tubeCoreRoll speed · Main motor power · Cooling water · Exit tube temp
Drawing machineCoreDrawing speed · Main motor current · Lubricant temp · Breaks today
Bright annealing furnaceCoreHeating zone temp · Protective gas flow · Furnace oxygen · Gas dew pointNFPA 86: atmosphere furnaces need purge and flammable-gas interlocks.
Eddy-current testerCopper tubeCommonLine speed · Defects marked today
Line controller (OEE)CommonOEE · Output (parts/h) · Energy per part
Overhead crane / hoistCommonHook load · Overload
Stamping pressCommonTonnage · Die protection tripped
ExtruderCommonMelt pressure
Heat-treat furnaceCommonFurnace temp · Temperature deviation
Induction furnaceOptionalPower · Ground leak (lining) · Cooling flow
Weighbridge / scaleOptionalCurrent weight · Load cell fault

Cooling water

Caster, mill and annealing furnace all depend on cooling water.

EquipmentLevelPoints worth watchingNotes
Cooling tower cellCoreTower leaving water · Tower entering water · Fan speed · Basin level · Water conductivity · Fan vibration
PumpCoreRunning · Speed · Differential pressureChilled and condenser water pumps; drives usually on Modbus TCP.
Process chillerCommonProcess water supply temp · Process water return temp · Load · Power draw
Domestic water boosterOptionalDischarge pressure · Flow

Compressed air & protective gas

Oxygen in the annealing gas (nitrogen-hydrogen) sets surface quality.

EquipmentLevelPoints worth watchingNotes
Air compressorCoreDischarge pressure · Load · Power draw · Fault
Refrigerated air dryerCommonPressure dew point · Pressure drop
Compressed-air headerCommonHeader pressure · Air demand · Receiver pressure
Bulk gas supplyCoreTank level · Supply pressure · Vaporizer outlet temp · Flow · Impurity · Reserve supply in useN2, O2, Ar, H2, CO2; tank telemetry is usually the gas supplier's.
On-site nitrogen generatorOptionalProduct O2 content · Output · Outlet pressure · Off-purity (on LIN backup)
Dust collectorCommonFilter pressure drop · Spark detected
Vibration / condition sensorCommonVelocity RMS

Power & sub-metering

Mills and drawing machines are big pulsing loads: watch demand and power quality.

EquipmentLevelPoints worth watchingNotes
Medium-voltage switchgearCoreBus voltage · Incoming current · Real power · Breaker closed · Protective trip · Relay troubleMonitor only — never operate breakers.
Power transformerCoreTop-oil temp · Winding temp · Load · Gas / sudden-pressure alarm · Over-temperature alarm
Low-voltage switchgearCoreBus voltage · Load current · Real power · Power factor · Current THD · Breaker trip
Motor control centerCommonMCC load · Current · Power factor · Current THD
Area energy meterCoreArea power · Energy today · 15-min demand · Power factorSub-metering by workshop or system for energy analysis and cost allocation.
Site utility meterCoreSite power · Site power (MW) · Energy today · Power factor
Power quality meterCommonVoltage THD · Current THD · Voltage sags today · Sag / interruption eventVoltage sags are a common hidden cause of trips.
Natural gas meterCommonNatural gas flow · Heat input (1,037 BTU/scf) · Gas today (scf)Natural gas in scfh, converted to BTU/h by heating value.
UPSCommonLoad · Battery runtime · On bypassSNMP v3 (UPS-MIB).
-48 V DC power plantCommonDC bus voltage · AC input lost
Busway / cable temperature (DTS)OptionalHottest point
Active harmonic filter (APF)CommonAfter current THD · Unit load · Modules in fault · Fan fault
Passive (tuned) harmonic filterCommonAfter current THD · Capacitor current, measured / rated · Resonance alarm
Hybrid harmonic filterOptionalAfter current THD · Unit load · Resonance alarm
Static var generator (SVG / STATCOM)CommonPF after · Unit load · Modules in fault
Static var compensator (SVC)OptionalReactive output · Valve over-temperature
Automatic capacitor bankCommonPower factor · Capacitor current, measured / rated · Resonance alarm · Switching operations today
Fixed capacitor bankOptionalReactive output · Fuse blown · Capacitor current, measured / rated
Step voltage regulatorOptionalTap position · At tap limit
Phase-shifting (harmonic-mitigating) transformerOptionalWinding temp · Primary current THD
Line / DC-link reactorOptionalReactor temp
Sine-wave filterOptionalOutput voltage THD · Filter temp
12 / 18-pulse front endOptionalInput current THD · Bridge current unbalance
Active front end (AFE) driveOptionalInput current THD
Transformer DGA monitorCommonHydrogen · Acetylene
Bushing monitorOptionalPower factor (tan δ) · Capacitance change
Winding temperature monitorCommonWinding hot spot
On-load tap changer control (OLTC)OptionalTap position · Tap fault · Operations today
Arc-flash protection relayCommonArc trip · Protection not ready
Neutral grounding resistor monitorOptionalNGR resistance · Resistor open · Ground fault

Life safety Monitor only

Gas, protective atmospheres and molten copper.

EquipmentLevelPoints worth watchingNotes
Fire alarm panelCoreFire alarm · Supervisory signal · Trouble signalMonitor only (NFPA 72).
Fire pumpCommonRunning · System pressure · Power phase failure
Sprinkler riserCommonRiser pressure · Waterflow alarm · Valve tamper
Combustible gas detectorCoreCombustible gas (LEL) · Gas alarmGas trains and hydrogen atmosphere areas.
Oxygen deficiency monitorCommonOxygen · Alarm 1 (O2 below 19.5 %) · Alarm 2 (O2 below 18 %)Nitrogen and inert-gas areas: 19.5 % and 18 % stages.

Security & video Monitor only

Camera and door status, and video linkage: cameras are linked to areas, devices and alarm rules; on an alarm the gateway takes an ONVIF snapshot and attaches it to the alarm, with a live-view link to the NVR/VMS. Core never contacts a camera.

EquipmentLevelPoints worth watchingNotes
Video cameraCommonOnline · Recording · Motion detected · Video analytics alarm · Tamper (blocked or moved)Status via the VMS (Milestone, Genetec…); on an alarm the gateway takes an ONVIF snapshot and attaches it to the alarm — Core never contacts a camera.
Access-controlled doorCommonDoor open · Door held open · Door forcedDoor events can drive camera linkage.

Life-safety equipment (fire alarm, gas detection, emergency power transfer) and protection devices are monitored only. FacilityOS never sends them commands.

Standards and compliance

Standards and complianceNotes
ASTM B88Seamless copper water tube.
ASTM B280Seamless copper tube for air conditioning and refrigeration field service.
NFPA 86Standard for ovens and furnaces (purge and interlocks of atmosphere furnaces).
ISO 50001Energy management systems.
OSHA 29 CFR 1910.147Control of hazardous energy (lockout/tagout).
IEC 62443Industrial automation and control system security.

Standards are listed with what they cover; numeric values are typical figures, not requirements for every site. FacilityOS supports your compliance work; it does not certify a site.

KPIs the platform tracks

KPIs the platform tracksNotes
Energy per ton(Electricity + gas) ÷ good output.
YieldGood product ÷ cathode input.
Break rateDrawing breaks per output.
Peak demand15-minute demand peak.

Reports

ReportsNotes
Melting & casting reportTemperatures, oxygen, casting speed and cooling water.
Energy & demand reportEnergy by process step and demand peaks.

How we deliver

We can take a Copper tube & metal processing project from survey and design through procurement, installation, commissioning and training — all of it, or only the stages you need.

  1. Site survey & needs assessment
  2. Solution design
  3. Procurement
  4. Installation
  5. Commissioning & acceptance
  6. Training
  7. Go-live & support

See it with your own equipment

Open the live demo now, or tell us about your site and we will map your equipment and systems to FacilityOS.