Commissioning & acceptance

Every point is checked and every write is proven by read-back before the site relies on it.

  1. Site survey & needs assessment
  2. Solution design
  3. Procurement
  4. Installation
  5. Commissioning & acceptance
  6. Training
  7. Go-live & support

What we do

  • Point-by-point comparison with the existing BMS and EPMS.
  • Every write tested through the 8-step change flow and confirmed by read-back.
  • Alarm tuning against the alarm health report.
  • Failure drills that never touch real equipment.
  • Commissioning and go-live sign-off with the customer.

What you receive

  • Commissioning & Go-Live Sign-off Sheet
  • Pilot evidence report

Start with a site assessment

Fill in the project survey or contact us to arrange a site assessment.

Fill in the project survey
Tell us about your site, systems and equipment. We use the survey to assess your needs, select the hardware and prepare a quote.

See it with your own equipment

Open the live demo now, or tell us about your site and we will map your equipment and systems to FacilityOS.